This is the 1U70 1014 Maidstone East to London Charing Cross on 22nd September 2026. See today's trains from Maidstone East around 1014 →
22nd September 2026 Detailed View
10:14 – Maidstone East → London Charing Cross Partially cancelled — Other technical failures above the Solebar operated by Southeastern
This service was cancelled between London Bridge and London Charing Cross.
Reported as far as London Bridge · 6 of 8 stops made, 2 cancelled · 37 of 38 miles
Formation Class 377
Passenger loading, as measured at London Bridge
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| MDE Maidstone East | 3 | 1014 | 1023 | +9 | ||
| WMA West Malling | 1 | 1022 | 1022 | 1036 | +14 | |
| BRG Borough Green & Wrotham | 1 | 1029 | 1029 | 1041 | 1042 | +13 |
| OTF Otford | 1 | 1037 | 1038 | 1052 | 1053 | +15 |
| SAY Swanley | 1 | 1047 | 1048 | 1101 | 1102 | +14 |
| LBG London Bridge | 8 was 9 | 1107 | 1109 | 1122 | +15 | |
| WAE London Waterloo East | D | 1114 | 1115 | Cancelled | ||
| CHX London Charing Cross | 5 | 1118 | Cancelled |
Italic estimated timing, bold is actual.