1U70 1014 Maidstone East to London Charing Cross

TrainTimesLive
Menu Close menu

This is the 1U70 1014 Maidstone East to London Charing Cross on 22nd September 2026. See today's trains from Maidstone East around 1014 →

22nd September 2026 Detailed View

10:14 – Maidstone East → London Charing Cross Partially cancelled — Other technical failures above the Solebar operated by Southeastern

This service was cancelled between London Bridge and London Charing Cross.

Reported as far as London Bridge · 6 of 8 stops made, 2 cancelled · 37 of 38 miles

Formation Class 377

Direction of travel: the leading coach is at the right of this diagram

Passenger loading, as measured at London Bridge

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
MDE Maidstone East 3 1014 1023 +9
WMA West Malling 1 1022 1022 1036 +14
BRG Borough Green & Wrotham 1 1029 1029 1041 1042 +13
OTF Otford 1 1037 1038 1052 1053 +15
SAY Swanley 1 1047 1048 1101 1102 +14
LBG London Bridge 8 was 9 1107 1109 1122 +15
WAE London Waterloo East D 1114 1115 Cancelled
CHX London Charing Cross 5 1118 Cancelled

Italic estimated timing, bold is actual.