This is the 1U70 2014 Maidstone East to London Charing Cross on 1st September 2026. See today's trains from Maidstone East around 2014 →
1st September 2026 Detailed View
20:14 – Maidstone East → London Charing Cross Arrived +6 Late operated by Southeastern
This service has been delayed by a speed restriction over defective track.
Reported as far as London Charing Cross · 8 of 8 stops made · 38 of 38 miles
Formation Class 375
Passenger loading, as measured at London Waterloo East
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| MDE Maidstone East | 3 | 2014 | 2018 | +4 | ||
| WMA West Malling | 1 | 2022 | 2022 | 2027 | 2027 | +5 |
| BRG Borough Green & Wrotham | 1 | 2029 | 2029 | 2032 | 2033 | +4 |
| OTF Otford | 1 | 2037 | 2038 | 2041 | 2042 | +4 |
| SAY Swanley | 1 | 2047 | 2048 | 2049 | 2051 | +3 |
| LBG London Bridge | 9 was 8 | 2107 | 2109 | 2115 | 2117 | +8 |
| WAE London Waterloo East | D | 2114 | 2115 | 2121 | 2121 | +7 |
| CHX London Charing Cross | 5 | 2118 | 2124 | +6 |
Italic estimated timing, bold is actual.