1U70 2014 Maidstone East to London Charing Cross

TrainTimesLive
Menu Close menu

This is the 1U70 2014 Maidstone East to London Charing Cross on 7th September 2026. See today's trains from Maidstone East around 2014 →

7th September 2026 Detailed View

20:14 – Maidstone East → London Charing Cross Arrived +9 Late operated by Southeastern

This service has been delayed by a speed restriction over defective track.

Reported as far as London Charing Cross · 8 of 8 stops made · 38 of 38 miles

Formation Class 375

Direction of travel: the leading coach is at the right of this diagram

Passenger loading, as measured at London Waterloo East

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
MDE Maidstone East 3 2014 2015 +1
WMA West Malling 1 2022 2022 2024 2024 +2
BRG Borough Green & Wrotham 1 2029 2029 2030 2031 +2
OTF Otford 1 2037 2038 2038 2039 +1
SAY Swanley 1 2047 2048 2051 2052 +4
LBG London Bridge 9 was 8 2107 2109 2118 2119 +10
WAE London Waterloo East D 2114 2115 2123 2124 +9
CHX London Charing Cross 5 2118 2127 +9

Italic estimated timing, bold is actual.