This is the 1U70 2014 Maidstone East to London Charing Cross on 29th October 2026. See today's trains from Maidstone East around 2014 →
29th October 2026 Detailed View
20:14 – Maidstone East → London Charing Cross Arrived +1 Late operated by Southeastern
This service has been delayed by passengers causing a disturbance on a train earlier today.
Reported as far as London Charing Cross · 8 of 8 stops made · 38 of 38 miles
Formation Class 375
Passenger loading, as measured at London Waterloo East
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| MDE Maidstone East | 3 | 2014 | 2016 | +2 | ||
| WMA West Malling | 1 | 2022 | 2022 | 2026 | 2025 | +3 |
| BRG Borough Green & Wrotham | 1 | 2029 | 2029 | 2031 | 2032 | +3 |
| OTF Otford | 1 | 2037 | 2038 | 2039 | 2040 | +2 |
| SAY Swanley | 1 | 2047 | 2048 | 2048 | 2049 | +1 |
| LBG London Bridge | 9 was 8 | 2107 | 2109 | 2110 | 2112 | +3 |
| WAE London Waterloo East | D | 2114 | 2115 | 2115 | 2116 | +1 |
| CHX London Charing Cross | 5 | 2118 | 2119 | +1 |
Italic estimated timing, bold is actual.
Route map
Straight lines between stops, not the track itself. Click the map to zoom and pan; on a phone, use two fingers.