This is the 1U70 2014 Maidstone East to London Charing Cross on 19th November 2026. See today's trains from Maidstone East around 2014 →
19th November 2026 Detailed View
20:14 – Maidstone East → London Charing Cross Arrived +25 Late operated by Southeastern
This service has been delayed by a fault with the signalling system earlier today.
Reported as far as London Charing Cross · 8 of 8 stops made · 38 of 38 miles
Formation Class 375
Passenger loading, as measured at London Waterloo East
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| MDE Maidstone East | 3 | 2014 | 2013 | -1 | ||
| WMA West Malling | 1 | 2022 | 2022 | 2022 | 2021 | -1 |
| BRG Borough Green & Wrotham | 1 | 2029 | 2029 | 2030 | 2032 | +3 |
| OTF Otford | 1 | 2037 | 2038 | 2040 | 2041 | +3 |
| SAY Swanley | 1 | 2047 | 2048 | 2051 | 2053 | +5 |
| LBG London Bridge | 8 | 2107 | 2109 | 2128 | 2131 | +22 |
| WAE London Waterloo East | D | 2114 | 2115 | 2138 | 2140 | +25 |
| CHX London Charing Cross | 4 was 5 | 2118 | 2143 | +25 |
Italic estimated timing, bold is actual.
Route map
Straight lines between stops, not the track itself. Click the map to zoom and pan; on a phone, use two fingers.