This is the 1U74 1114 Maidstone East to London Charing Cross on 29th August 2026. See today's trains from Maidstone East around 1114 →
29th August 2026 Detailed View
11:14 – Maidstone East → London Charing Cross Arrived -1 Early operated by Southeastern
Reported as far as London Charing Cross · 8 of 8 stops made · 38 of 38 miles
Formation Class 377
Passenger loading, as measured at London Waterloo East
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| MDE Maidstone East | 3 | 1114 | 1113 | -1 | ||
| WMA West Malling | 1 | 1122 | 1122 | 1122 | ·on time | |
| BRG Borough Green & Wrotham | 1 | 1129 | 1129 | 1127 | 1129 | ·on time |
| OTF Otford | 1 | 1137 | 1138 | 1136 | 1137 | -1 |
| SAY Swanley | 1 | 1147 | 1148 | 1145 | 1147 | -1 |
| LBG London Bridge | 8 | 1207 | 1209 | 1206 | 1208 | -1 |
| WAE London Waterloo East | D | 1214 | 1215 | 1211 | 1212 | -3 |
| CHX London Charing Cross | 5 | 1218 | 1217 | -1 |
Italic estimated timing, bold is actual.