This is the 2C30 1153 Dartford to London Charing Cross on 23rd September 2026. See today's trains from Dartford around 1153 →
23rd September 2026 Detailed View
11:53 – Dartford → London Charing Cross Arrived On time operated by Southeastern
Reported as far as London Charing Cross · 12 of 12 stops made · 17 of 17 miles
Formation Class 707
Passenger loading, as measured at London Waterloo East
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| DFD Dartford | 1 | 1153 | 1155 | +2 | ||
| BNH Barnehurst | 1 | 1200 | 1201 | 1201 | 1202 | +1 |
| BXH Bexleyheath | 1 | 1204 | 1205 | 1205 | 1205 | ·on time |
| WLI Welling | 1 | 1208 | 1208 | 1208 | 1209 | +1 |
| FCN Falconwood | 1 | 1210 | 1210 | 1211 | 1211 | +1 |
| ELW Eltham | 1 | 1213 | 1213 | 1214 | 1214 | +1 |
| KDB Kidbrooke | 1 | 1216 | 1217 | 1217 | 1217 | +1 |
| BKH Blackheath | 1 | 1220 | 1221 | 1220 | 1221 | ·on time |
| LEW Lewisham | 3 | 1224 | 1225 | 1224 | 1224 | +1 |
| LBG London Bridge | 9 | 1233 | 1235 | 1232 | 1234 | -1 |
| WAE London Waterloo East | B | 1239 | 1240 | 1238 | 1240 | ·on time |
| CHX London Charing Cross | 3 | 1243 | 1243 | ·on time |
Italic estimated timing, bold is actual.