This is the 2H28 2056 London Charing Cross to Tunbridge Wells on 7th September 2026. See today's trains from London Charing Cross around 2056 →
7th September 2026 Detailed View
20:56 – London Charing Cross → Tunbridge Wells Arrived +1 Late operated by Southeastern
Reported as far as Tunbridge Wells · 9 of 9 stops made · 34 of 34 miles
Formation Classes 465, 466
How busy: 17% full. Darwin's own figure for the whole train, not per carriage, reported at London Charing Cross at 07:52.
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| CHX London Charing Cross | 6 | 2056 | 2055 | -1 | ||
| WAE London Waterloo East | C | 2059 | 2059 | 2100 | 2101 | +2 |
| LBG London Bridge | 7 | 2104 | 2106 | 2108 | 2109 | +3 |
| ORP Orpington | 3 | 2122 | 2122 | 2124 | 2125 | +3 |
| SEV Sevenoaks | 3 | 2133 | 2134 | 2134 | 2136 | +2 |
| HLB Hildenborough | 2 | 2140 | 2140 | 2142 | 2143 | +3 |
| TON Tonbridge | 3 | 2144 | 2145 | 2147 | 2148 | +3 |
| HIB High Brooms | 2 | 2153 | 2153 | 2154 | 2155 | +2 |
| TBW Tunbridge Wells | 1 | 2157 | 2158 | +1 |
Italic estimated timing, bold is actual.