This is the 2H56 1616 Tunbridge Wells to London Charing Cross on 1st September 2026. See today's trains from Tunbridge Wells around 1616 →
1st September 2026 Detailed View
16:16 – Tunbridge Wells → London Charing Cross Arrived +17 Late operated by Southeastern
This service has been delayed by a speed restriction over defective track.
Reported as far as London Charing Cross · 10 of 10 stops made · 34 of 34 miles
Formation Classes 466, 465
How busy: 8% full. Darwin's own figure for the whole train, not per carriage, reported at Tunbridge Wells at 13:22.
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| TBW Tunbridge Wells | 1 | 1616 | 1624 | +8 | ||
| HIB High Brooms | 1 | 1619 | 1620 | 1627 | 1628 | +8 |
| TON Tonbridge | 2 | 1627 | 1628 | 1635 | 1636 | +8 |
| HLB Hildenborough | 1 | 1632 | 1632 | 1642 | 1643 | +11 |
| SEV Sevenoaks | 1 | 1638 | 1639 | 1649 | 1650 | +11 |
| CLD Chelsfield | 1 | 1646 | 1647 | 1658 | 1659 | +12 |
| ORP Orpington | 2 | 1649 | 1650 | 1701 | 1704 | +14 |
| LBG London Bridge | 9 | 1705 | 1707 | 1719 | 1721 | +14 |
| WAE London Waterloo East | D | 1711 | 1712 | 1724 | 1725 | +13 |
| CHX London Charing Cross | 6 | 1715 | 1732 | +17 |
Italic estimated timing, bold is actual.