This is the 2H76 2119 Tunbridge Wells to London Charing Cross on 1st September 2026. See today's trains from Tunbridge Wells around 2119 →
1st September 2026 Detailed View
21:19 – Tunbridge Wells → London Charing Cross Arrived +13 Late operated by Southeastern
This service has been delayed by a speed restriction over defective track.
Reported as far as London Charing Cross · 9 of 9 stops made · 34 of 34 miles
Formation Classes 466, 465
How busy: 8% full. Darwin's own figure for the whole train, not per carriage, reported at Tunbridge Wells at 13:22.
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| TBW Tunbridge Wells | 1 | 2119 | 2124 | +5 | ||
| HIB High Brooms | 1 | 2122 | 2123 | 2127 | 2127 | +5 |
| TON Tonbridge | 2 | 2129 | 2130 | 2133 | 2134 | +4 |
| HLB Hildenborough | 1 | 2134 | 2134 | 2140 | 2140 | +7 |
| SEV Sevenoaks | 1 | 2140 | 2141 | 2147 | 2148 | +7 |
| ORP Orpington | 2 | 2149 | 2150 | 2157 | 2158 | +8 |
| LBG London Bridge | 8 was 9 | 2205 | 2207 | 2219 | 2220 | +13 |
| WAE London Waterloo East | D | 2211 | 2212 | 2225 | 2226 | +14 |
| CHX London Charing Cross | 6 | 2215 | 2228 | +13 |
Italic estimated timing, bold is actual.