This is the 2H76 2119 Tunbridge Wells to London Charing Cross on 19th November 2026. See today's trains from Tunbridge Wells around 2119 →
19th November 2026 Detailed View
21:19 – Tunbridge Wells → London Charing Cross Arrived +4 Late operated by Southeastern
This service has been delayed by a fault with the signalling system earlier today.
Reported as far as London Charing Cross · 9 of 9 stops made · 34 of 34 miles
Formation Classes 466, 465
How busy: 13% full. Darwin's own figure for the whole train, not per carriage, reported at Tunbridge Wells at 13:52.
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| TBW Tunbridge Wells | 1 | 2119 | 2121 | +2 | ||
| HIB High Brooms | 1 | 2122 | 2123 | 2124 | 2125 | +2 |
| TON Tonbridge | 2 | 2129 | 2130 | 2130 | 2131 | +1 |
| HLB Hildenborough | 1 | 2134 | 2134 | 2135 | 2136 | +2 |
| SEV Sevenoaks | 1 | 2140 | 2141 | 2142 | 2143 | +2 |
| ORP Orpington | 2 | 2149 | 2150 | 2153 | 2154 | +4 |
| LBG London Bridge | 9 | 2205 | 2207 | 2210 | 2211 | +4 |
| WAE London Waterloo East | D | 2211 | 2212 | 2215 | 2216 | +4 |
| CHX London Charing Cross | 5 was 6 | 2215 | 2219 | +4 |
Italic estimated timing, bold is actual.
Route map
Straight lines between stops, not the track itself. Click the map to zoom and pan; on a phone, use two fingers.