This is the 2N66 1308 London Charing Cross to Dartford on 13th September 2026. See today's trains from London Charing Cross around 1308 →
13th September 2026 Detailed View
13:08 – London Charing Cross → Dartford Arrived -1 Early operated by Southeastern
Reported as far as Dartford · 12 of 12 stops made · 17 of 17 miles
Formation Class 376
Passenger loading, as measured at Bexley
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| CHX London Charing Cross | 3 | 1308 | 1307 | -1 | ||
| WAE London Waterloo East | A | 1311 | 1311 | 1310 | 1310 | ·on time |
| LBG London Bridge | 6 | 1315 | 1316 | 1314 | 1315 | -1 |
| HGR Hither Green | 6 | 1325 | 1326 | 1326 | 1326 | +1 |
| LEE Lee | 2 | 1328 | 1328 | 1328 | 1329 | +1 |
| MTG Mottingham | 2 | 1332 | 1332 | 1332 | 1332 | +1 |
| NEH New Eltham | 2 | 1334 | 1335 | 1334 | 1335 | ·on time |
| SID Sidcup | 2 | 1338 | 1338 | 1337 | 1338 | ·on time |
| AYP Albany Park | 2 | 1341 | 1341 | 1340 | 1340 | ·on time |
| BXY Bexley | 2 | 1343 | 1344 | 1342 | 1343 | -1 |
| CRY Crayford | 2 | 1347 | 1347 | 1346 | 1346 | ·on time |
| DFD Dartford | 1 | 1353 | 1352 | -1 |
Italic estimated timing, bold is actual.