This is the 2T64 2003 Strood to Paddock Wood on 27th August 2026. See today's trains from Strood around 2003 →
27th August 2026 Detailed View
20:03 – Strood → Paddock Wood Arrived -1 Early operated by Southeastern
Reported as far as Paddock Wood · 13 of 13 stops made · 21 of 21 miles
Formation Class 375
Passenger loading, as measured at Beltring
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| SOO Strood | 3 | 2003 | 2002 | -1 | ||
| CUX Cuxton | 2 | 2007 | 2008 | 2006 | 2007 | -1 |
| HAI Halling | 2 | 2011 | 2011 | 2010 | 2011 | ·on time |
| SDA Snodland | 2 | 2014 | 2015 | 2013 | 2014 | -1 |
| NHE New Hythe | 2 | 2018 | 2018 | 2017 | 2017 | ·on time |
| AYL Aylesford | 2 | 2020 | 2021 | 2019 | 2021 | ·on time |
| MDB Maidstone Barracks | 2 | 2026 | 2026 | 2025 | 2026 | ·on time |
| MDW Maidstone West | 2 | 2029 | 2030 | 2028 | 2030 | ·on time |
| EFL East Farleigh | 1 | 2033 | 2033 | 2033 | 2033 | ·on time |
| WTR Wateringbury | 1 | 2038 | 2039 | 2038 | 2038 | ·on time |
| YAL Yalding | 1 | 2042 | 2042 | 2041 | 2042 | ·on time |
| BEG Beltring | 1 | 2045 | 2045 | 2045 | 2045 | ·on time |
| PDW Paddock Wood | 3 | 2050 | 2049 | -1 |
Italic estimated timing, bold is actual.