This is the 2U22 2233 London Victoria (E) to Gravesend on 22nd September 2026. See today's trains from Denmark Hill around 2243 →
22nd September 2026 Detailed View
22:33 – London Victoria (E) → Gravesend Arrived +8 Late operated by Southeastern
This service has been delayed by a speed restriction over defective track.
Reported as far as Gravesend · 15 of 15 stops made · 25 of 25 miles
Formation Class 376
Passenger loading, as measured at Greenhithe for Bluewater
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| London Victoria (E) | 5 | 2233 | 2236 | +3 | ||
| DMK Denmark Hill | 4 | 2242 | 2243 | 2246 | 2247 | +4 |
| PMR Peckham Rye | 4 | 2245 | 2246 | 2249 | 2250 | +4 |
| NHD Nunhead | 2 | 2249 | 2249 | 2252 | 2253 | +4 |
| LEW Lewisham | 4 | 2255 | 2256 | 2259 | 2259 | +4 |
| BKH Blackheath | 2 | 2259 | 2259 | 2302 | 2302 | +4 |
| KDB Kidbrooke | 2 | 2302 | 2302 | 2305 | 2306 | +4 |
| ELW Eltham | 2 | 2305 | 2306 | 2309 | 2309 | +4 |
| FCN Falconwood | 2 | 2309 | 2309 | 2311 | 2312 | +3 |
| WLI Welling | 2 | 2311 | 2311 | 2314 | 2315 | +4 |
| BXH Bexleyheath | 2 | 2314 | 2315 | 2317 | 2318 | +3 |
| BNH Barnehurst | 2 | 2318 | 2318 | 2320 | 2321 | +3 |
| DFD Dartford | 4 | 2325 | 2326 | 2330 | 2331 | +5 |
| GNH Greenhithe for Bluewater | 2 | 2331 | 2331 | 2336 | 2336 | +6 |
| GRV Gravesend | 1 | 2338 | 2346 | +8 |
Italic estimated timing, bold is actual.