26th August 2026
14:00 – Sandicare Ballast Sidings → Doncaster Down Decoy GBRF Planned operated by Not specified (freight or charter)
No movement reports · booked away 1400 · either it has not started, or its reports are not reaching us
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| Sandicare Ballast Sidings not advertised | 1400 | |||||
| Toton North Junction pass FLLine | 14021402 | FL | ||||
| Trowell Junction pass | 14061406 | |||||
| LGM Langley Mill pass 1 min pathing allowance | 1 | 1410½1410½ | ||||
| Ironville Junction pass | 14151415 | |||||
| ALF Alfreton pass 1 min pathing allowance | 14181418 | |||||
| Clay Cross North Junction pass ELLine | 14261426 | EL | ||||
| Chesterfield South Junction pass 1 min pathing allowance DBHLine | 14281428 | DBH | ||||
| CHD Chesterfield pass DBHLine | 3 | 14301430 | DBH | |||
| Tapton Junction pass 3 min pathing allowance | 1430½1430½ | |||||
| Barrow Hill North Junction pass 6 min pathing allowance | 1436½1436½ | |||||
| Beighton Junction pass 6 min pathing allowance | 1448½1448½ | |||||
| Treeton Junction pass 2 min engineering allowance | 1500½1500½ | |||||
| Masborough Junction not advertised | 1506½1509½ | |||||
| Aldwarke Junction pass | 1514½1514½ | |||||
| SWN Swinton (S.Yorks) pass | 1518½1518½ | |||||
| MEX Mexborough pass | 1520½1520½ | |||||
| Hexthorpe Junction pass GLLine | 1526½1526½ | GL | ||||
| St James Junction pass | 1529½1529½ | |||||
| Bridge Junction pass WSLLine | 1530½1530½ | WSL | ||||
| Decoy Nth Junction pass | 1532½1532½ | |||||
| Doncaster Down Decoy GBRF not advertised | 1535 | |||||
Italic estimated timing, bold is actual.