25th September 2026 Follow
14:54 – Exeter St Davids → Plymouth Arrived -1 Early operated by Great Western Railway
Empty coaching stock not available to passengers
Reported as far as Plymouth · 2 of 2 stops made · 52 of 52 miles
Formation Class 175
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| EXD Exeter St Davids not advertised 2½ min pathing allowance | 6 | 1454 | 1452 | -2 | ||
| DWW Dawlish Warren pass ½ min pathing allowance | 1 | 1506½1506½ | pass1503 | -3 | ||
| DWL Dawlish pass | 1 | 1508½1508½ | pass1504 | -3 | ||
| TGM Teignmouth pass 3½ min pathing allowance | 1 | 1511½1511½ | pass1507 | -3 | ||
| NTA Newton Abbot pass | 2 | 15201520 | pass1516 | -3 | ||
| Newton Abbot West Junction pass | 1520½1520½ | pass1517 | -3 | |||
| Dainton Tunnel pass | 1524½1524½ | pass1521 | -3 | |||
| TOT Totnes pass | 1 | 15301530 | pass1529 | -1 | ||
| Rattery pass | D | 15361536 | pass1535 | -1 | ||
| Aish Emergency Crossover pass | D | 1539½1539½ | pass1538 | -1 | ||
| IVY Ivybridge pass | 1 | 1543½1543½ | pass1542 | -1 | ||
| Hemerdon pass | D | 1547½1547½ | pass1547 | ·on time | ||
| Tavistock Junction pass 1 min engineering allowance | D | 15511551 | pass1550 | -1 | ||
| Lipson Junction pass | 1553½1553½ | pass1552 | -1 | |||
| PLY Plymouth not advertised | 4 was DK3 | 1557 | 1556 | -1 | ||
Italic estimated timing, bold is actual.