22nd September 2026
07:50 – Paignton → Exeter St Davids Arrived -3 Early operated by Great Western Railway
Empty coaching stock not available to passengers
Reported as far as Exeter St Davids · 2 of 2 stops made · 28 of 28 miles
Formation Class 175
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| PGN Paignton not advertised | 2 | 0750 | 0750 | ·on time | ||
| TQY Torquay not advertised operational stop | 2 | 07540755 | 07540754 | ·on time | ||
| TRR Torre not advertised operational stop 4 min pathing allowance | 2 | 07570758 | 07570757 | ·on time | ||
| Newton Abbot West Junction pass 1 min pathing allowance | 08080808 | pass0808 | ·on time | |||
| NTA Newton Abbot not advertised operational stop | 3 | 08100811 | 08090810 | -1 | ||
| TGM Teignmouth not advertised operational stop | 2 | 08170818 | 08160817 | -1 | ||
| DWL Dawlish not advertised operational stop | 2 | 08220823 | 08210821 | -1 | ||
| DWW Dawlish Warren not advertised operational stop | 2 | 08260827 | 08250826 | -1 | ||
| SCS Starcross not advertised operational stop | 2 | 08300831 | 08290830 | -1 | ||
| MBT Marsh Barton not advertised operational stop | 08380839 | 08370838 | -1 | |||
| EXT Exeter St Thomas not advertised operational stop 1 min engineering allowance | 2 | 08420843 | 08400841 | -2 | ||
| EXD Exeter St Davids not advertised | 5 | 0846 | 0843 | -3 | ||
Italic estimated timing, bold is actual.