3R02 0804 Severn Tunnel Ugl to Bristol High Level Siding

TrainTimesLive
Menu Close menu

10th November 2026

08:04 – Severn Tunnel Ugl → Bristol High Level Siding Arrived -4 Early operated by Transport for Wales

Empty coaching stock not available to passengers

Reported as far as Bristol High Level Siding · 14 of 14 reporting points · 16 of 16 miles

Formation Class 150

Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram

Calling pattern Timing points only — this train makes no public stops

Calling pattern, including passing points
Booked Actual Route
Location PlatformPlat arrdep arrdep Status Line Path
Severn Tunnel Ugl not advertised 0804 no report
Severn Tunnel West pass 2 min pathing allowance 0805½0805½ pass0800 -5
Severn Tunnel East pass 0811½0811½ pass0804 -7
PIL Pilning pass 1½ min pathing allowance 1 0812½0812½ pass0805 -6
PWY Patchway pass 1 0817½0817½ pass0809 -7
FIT Filton Abbey Wood not advertised operational stop RLLine 3 08200822 08120813 -9 RL
Horfield Junction pass 0823½0823½ pass0814 -9
Narroways Hill Junction pass ½ min pathing allowance 08250825 pass0818 -7
SRD Stapleton Road not advertised operational stop 2 0826½0831½ 08190820 -11
Dr Day's Junction pass DRLine 08330833 pass0822 -11 DR
Bristol East Junction pass URLine 08340834 pass0830 -4 UR
BRI Bristol Temple Meads not advertised operational stop, reverses here 3 08350839 08310839 ·on time
Bristol East Junction not advertised operational stop, reverses here 08410846 08410841 -5
Bristol High Level Siding not advertised 0848 0844 -4

Italic estimated timing, bold is actual.