3R02 0804 Severn Tunnel Ugl to Bristol High Level Siding

TrainTimesLive
Menu Close menu

11th November 2026

08:04 – Severn Tunnel Ugl → Bristol High Level Siding Arrived -4 Early operated by Transport for Wales

Empty coaching stock not available to passengers

Reported as far as Bristol High Level Siding · 14 of 14 reporting points · 16 of 16 miles

Formation Class 150

Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram

Calling pattern Timing points only — this train makes no public stops

Calling pattern, including passing points
Booked Actual Route
Location PlatformPlat arrdep arrdep Status Line Path
Severn Tunnel Ugl not advertised 0804 0810 +6
Severn Tunnel West pass 2 min pathing allowance 0805½0805½ pass0811 +6
Severn Tunnel East pass 0811½0811½ pass0815 +4
PIL Pilning pass 1½ min pathing allowance 1 0812½0812½ pass0816 +5
PWY Patchway pass 1 0817½0817½ pass0820 +3
FIT Filton Abbey Wood not advertised operational stop RLLine 3 08200822 08230824 +2 RL
Horfield Junction pass 0823½0823½ pass0825 +2
Narroways Hill Junction pass ½ min pathing allowance 08250825 pass0829 +4
SRD Stapleton Road not advertised operational stop 2 0826½0831½ 0830 +4
Dr Day's Junction pass DRLine 08330833 pass0831 -2 DR
Bristol East Junction pass URLine 08340834 pass0835 +1 UR
BRI Bristol Temple Meads not advertised operational stop, reverses here 3 08350839 08360841 +2
Bristol East Junction not advertised operational stop, reverses here 08410846 08420842 +1
Bristol High Level Siding not advertised 0848 0844 -4

Italic estimated timing, bold is actual.