3Q66 1533 London Marylebone to Banbury Depot

TrainTimesLive
Menu Close menu

25th September 2026

15:33 – London Marylebone → Banbury Depot Planned operated by Chiltern Railways

Empty coaching stock not available to passengers

No movement reports · booked away 1533 · either it has not started, or its reports are not reaching us

Formation

Direction of travel: the leading coach is at the right of this diagram

Calling pattern Timing points only — this train makes no public stops

Calling pattern, including passing points
Booked Actual Route
Location PlatformPlat arrdep arrdep Status Line Path
MYB London Marylebone not advertised 1 min performance allowance 2 1533
XNJ Neasden South Junction pass 15411541
WCX Wembley Stadium pass 2 15421542
Northolt Park Junction pass ½ min performance allowance SLLine 1545½1545½ SL
SRU South Ruislip not advertised operational stop 15481556
WRU West Ruislip pass 15591559
GER Gerrards Cross not advertised operational stop 1 min performance allowance 1 16031606
HWY High Wycombe not advertised operational stop 2 16151618
SDR Saunderton pass 2 16231623
PRR Princes Risborough not advertised operational stop 3 16261628
HDM Haddenham & Thame Parkway not advertised operational stop 1 16341636
XJV Bicester South Junction pass 1 min engineering, ½ min performance allowance 16451645
BCS Bicester North not advertised operational stop 1 min performance allowance 1 1647½1649
XAN Aynho Junction pass ½ min pathing allowance 16581658
Banbury Depot Junction pass DCVLine 1702½1702½ DCV
BAN Banbury not advertised operational stop, reverses here 1 17041714
Banbury Depot Reception not advertised operational stop 17151716
Banbury Depot not advertised 1718

Italic estimated timing, bold is actual.