28th August 2026
17:01 – Banbury → Birmingham Moor Street Planned operated by Chiltern Railways
Empty coaching stock not available to passengers
No movement reports · booked away 1701 · either it has not started, or its reports are not reaching us
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| BAN Banbury not advertised DCVLine | 4 | 1701 | DCV | |||
| Reservoir Junction pass | 17041704 | |||||
| XFC Fenny Compton pass 1 min engineering allowance | 17101710 | |||||
| LMS Leamington Spa not advertised operational stop | 2 | 17211722 | ||||
| WRW Warwick not advertised operational stop | 1725½1726½ | |||||
| WRP Warwick Parkway not advertised operational stop | 2 | 17291730 | ||||
| HTN Hatton pass | 2 | 1733½1733½ | ||||
| DDG Dorridge not advertised operational stop | 2 | 1739½1740½ | ||||
| Bentley Heath Crossing pass | 1741½1741½ | |||||
| SOL Solihull not advertised operational stop 3 min pathing allowance | 17461747 | |||||
| TYS Tyseley pass ½ min performance allowance FLLine | 2 | 17541754 | FL | |||
| XOH Small Heath South Junction pass 1 min engineering allowance SHLine | 17551755 | SH | ||||
| BMO Birmingham Moor Street not advertised | 3 | 1800 | ||||
Italic estimated timing, bold is actual.