28th August 2026
13:25 – Stourbridge Junction Depot → Bicester North Planned operated by Chiltern Railways
Empty coaching stock not available to passengers
No movement reports · booked away 1325 · either it has not started, or its reports are not reaching us
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| Stourbridge Junction Depot not advertised | 1325 | |||||
| ROW Rowley Regis not advertised operational stop | 1336½1338 | |||||
| SMW Smethwick Junction pass | 13421342 | |||||
| SGB Smethwick Galton Bridge (High Level) not advertised operational stop | 2 | 1342½1344½ | ||||
| JEQ Jewellery Quarter pass 1 min engineering, 2½ min pathing allowance | 2 | 1348½1348½ | ||||
| BSW Birmingham Snow Hill not advertised operational stop | 3 | 13541356 | ||||
| BMO Birmingham Moor Street not advertised operational stop SHLine | 1 | 13581400 | SH | |||
| XOH Small Heath South Junction pass 4 min pathing allowance SLLine | 14031403 | SL | ||||
| TYS Tyseley pass | 3 | 14081408 | ||||
| SOL Solihull not advertised operational stop Pathed as Class 158/168/170/175 on diesel at 100mph from here | 1412½1416½ | |||||
| Bentley Heath Crossing pass | 1420½1420½ | |||||
| Dorridge Up Passenger Loop not advertised waits for another train to pass | 1422½1432½ | |||||
| DDG Dorridge not advertised operational stop Pathed as 68 tonnes on diesel at 100mph from here | 1 | 1433½1437½ | ||||
| HTN Hatton pass | 1 | 14431443 | ||||
| WRP Warwick Parkway not advertised operational stop | 1 | 14461448 | ||||
| LMS Leamington Spa not advertised operational stop | UM | 1452½1454½ | ||||
| XFC Fenny Compton pass | 15041504 | |||||
| Reservoir Junction pass UCVLine | 15101510 | UCV | ||||
| BAN Banbury not advertised operational stop | 4 | 1512½1515½ | ||||
| XAN Aynho Junction pass | 15201520 | |||||
| BCS Bicester North not advertised | 2 | 1527 | ||||
Italic estimated timing, bold is actual.