1D94 2002 London Euston to Holyhead

TrainTimesLive
Menu Close menu

This is the 1D94 2002 London Euston to Holyhead on 18th September 2026. See today's trains from London Euston around 2002 →

18th September 2026 Detailed View

20:02 – London Euston → Holyhead Arrived +16 Late operated by Avanti West Coast

This service has been delayed by a speed restriction over defective track.

electric for 1h47 · diesel from Crewe for 2h04

Reported as far as Holyhead · 11 of 11 stops made · 256 of 256 miles

Formation Class 805 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spaces

Direction of travel: the leading coach is at the right of this diagram

Quiet coach Wheelchair spaces Catering Cycle spaces First class

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
EUS London Euston 7 was 12 2002 2002 ·on time
STA Stafford 3 2122 2124 2131 2132 +8
CRE Crewe Pathed as Class 805 on diesel at 125mph from here 11 2145 2149 2150 2151 +2
CTR Chester 3 2210 2211 2212 2214 +3
FLN Flint 2 2224 2225 2226 2228 +3
PRT Prestatyn 2 2237 2238 2239 2240 +2
RHL Rhyl 2 2243 2244 2245 2247 +3
CWB Colwyn Bay 2254 2255 2259 2301 +6
LLJ Llandudno Junction 4 2302 2305 2304 2306 +1
BNG Bangor (Gwynedd) 2 2321 2325 2327 2330 +5
HHD Holyhead 1 2353 0009 +16

Italic estimated timing, bold is actual.