This is the 1B19 1438 London Paddington to Carmarthen on 12th September 2026. See today's trains from London Paddington around 1438 →
12th September 2026 Detailed View
14:38 – London Paddington → Carmarthen Partially cancelled — Track defects other than rail defects operated by Great Western Railway
This service was cancelled between Swansea and Carmarthen. This service has been cancelled because of a shortage of train crew.
electric for 1h56 · diesel from Cardiff Central for 1h46
Reported as far as Swansea Loop East · 10 of 13 stops made, 3 cancelled · 190 of 222 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| PAD London Paddington | 2 | 1438 | 1439 | +1 | ||
| RDG Reading | 9 | 1513 | 1514 | 1520 | 1522 | +8 |
| SWI Swindon | 4 | 1540 | 1541 | 1546 | 1548 | +7 |
| BPW Bristol Parkway | 2 | 1603 | 1604 | 1619 | 1621 | +17 |
| NWP Newport (South Wales) | 3 was 2 | 1623 | 1624 | 1645 | 1646 | +22 |
| CDF Cardiff Central | 4 was 3 | 1637 | 1640 | 1658 | 1701 | +21 |
| BGN Bridgend | 1 | 1659 | 1700 | 1725 | 1727 | +27 |
| PTA Port Talbot Parkway | 1 | 1711 | 1712 | 1740 | 1743 | +31 |
| NTH Neath Pathed as Class 802 on diesel at 125mph from here | 1 | 1718 | 1719 | 1752 | 1753 | +34 |
| SWA Swansea | 3 | 1732 | 1740 | 1808 | +37 | |
| LLE Llanelli | DPL | 1756 | 1758 | Cancelled | ||
| PBY Pembrey & Burry Port | 1804 | 1808 | Cancelled | |||
| CMN Carmarthen | 2 | 1830 | Cancelled |
Italic estimated timing, bold is actual.