25th September 2026 Follow Detailed View
06:30 – London Paddington → Cheltenham Spa Arrived On time operated by Great Western Railway
electric for 1h00 · diesel from Swindon for 1h02
Reported as far as Cheltenham Spa · 9 of 9 stops made · 121 of 121 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
London Paddington → Gloucester
1 of 2
Gloucester → Cheltenham Spa
2 of 2
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| PAD London Paddington | 3 | 0630 | 0630 | ·on time | ||
| RDG Reading | 8 | 0653 | 0656 | 0653 | 0656 | ·on time |
| DID Didcot Parkway | 1 | 0707 | 0710 | 0707 | 0710 | ·on time |
| SWI Swindon Pathed as Class 802 on diesel at 125mph from here | 3 | 0725 | 0730 | 0726 | 0730 | ·on time |
| KEM Kemble | 2 | 0741 | 0743 | 0741 | 0743 | ·on time |
| STD Stroud | 2 | 0757 | 0759 | 0756 | 0800 | +1 |
| SHU Stonehouse | 2 | 0803 | 0804 | 0803 | 0805 | +1 |
| GCR Gloucester | 1 | 0818 | 0824 | 0819 | 0824 | ·on time |
| CNM Cheltenham Spa | 2 | 0832 | 0832 | ·on time |
Italic estimated timing, bold is actual.