25th September 2026 Follow Detailed View
13:32 – London Paddington → Cheltenham Spa Arrived +4 Late operated by Great Western Railway
electric for 58 min · diesel from Swindon for 1h01
Reported as far as Cheltenham Spa · 9 of 9 stops made · 121 of 121 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
London Paddington → Gloucester
1 of 2
Gloucester → Cheltenham Spa
2 of 2
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| PAD London Paddington | 1 | 1332 | 1332 | ·on time | ||
| RDG Reading | 8 | 1355 | 1358 | 1355 | 1358 | ·on time |
| DID Didcot Parkway | 1 | 1410 | 1411 | 1409 | 1411 | ·on time |
| SWI Swindon Pathed as Class 802 on diesel at 125mph from here | 1 | 1428 | 1430 | 1427 | 1429 | -1 |
| KEM Kemble | 2 | 1441 | 1443 | 1441 | 1443 | ·on time |
| STD Stroud | 2 | 1457 | 1459 | 1456 | 1458 | -1 |
| SHU Stonehouse | 2 | 1503 | 1503 | 1502 | 1503 | ·on time |
| GCR Gloucester | 1 was 2 | 1516 | 1522 | 1521 | 1525 | +3 |
| CNM Cheltenham Spa | 2 | 1531 | 1535 | +4 |
Italic estimated timing, bold is actual.