This is the 1G19 1433 London Paddington to Cheltenham Spa on 29th August 2026. See today's trains from London Paddington around 1433 →
29th August 2026 Detailed View
14:33 – London Paddington → Cheltenham Spa Arrived -1 Early operated by Great Western Railway
electric for 57 min · diesel from Swindon for 1h01
Reported as far as Cheltenham Spa · 9 of 9 stops made · 121 of 121 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
London Paddington → Gloucester
1 of 2
Gloucester → Cheltenham Spa
2 of 2
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| PAD London Paddington | 11 | 1433 | 1433 | ·on time | ||
| RDG Reading | 8 | 1456 | 1458 | 1456 | 1458 | ·on time |
| DID Didcot Parkway | 1 | 1510 | 1511 | 1510 | 1512 | +1 |
| SWI Swindon Pathed as Class 802 on diesel at 125mph from here | 3 | 1528 | 1530 | 1528 | 1531 | +1 |
| KEM Kemble | 2 | 1541 | 1543 | 1542 | 1544 | +1 |
| STD Stroud | 2 | 1557 | 1559 | 1557 | 1559 | ·on time |
| SHU Stonehouse | 2 | 1603 | 1603 | 1602 | 1606 | +3 |
| GCR Gloucester | 2 | 1616 | 1622 | 1619 | 1621 | -1 |
| CNM Cheltenham Spa | 2 | 1631 | 1630 | -1 |
Italic estimated timing, bold is actual.