1G19 1433 London Paddington to Cheltenham Spa

TrainTimesLive
Menu Close menu

This is the 1G19 1433 London Paddington to Cheltenham Spa on 29th August 2026. See today's trains from London Paddington around 1433 →

29th August 2026 Detailed View

14:33 – London Paddington → Cheltenham Spa Arrived -1 Early operated by Great Western Railway

electric for 57 min · diesel from Swindon for 1h01

Reported as far as Cheltenham Spa · 9 of 9 stops made · 121 of 121 miles

Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
PAD London Paddington 11 1433 1433 ·on time
RDG Reading 8 1456 1458 1456 1458 ·on time
DID Didcot Parkway 1 1510 1511 1510 1512 +1
SWI Swindon Pathed as Class 802 on diesel at 125mph from here 3 1528 1530 1528 1531 +1
KEM Kemble 2 1541 1543 1542 1544 +1
STD Stroud 2 1557 1559 1557 1559 ·on time
SHU Stonehouse 2 1603 1603 1602 1606 +3
GCR Gloucester 2 1616 1622 1619 1621 -1
CNM Cheltenham Spa 2 1631 1630 -1

Italic estimated timing, bold is actual.