1G27 1828 London Paddington to Cheltenham Spa

TrainTimesLive
Menu Close menu

This is the 1G27 1828 London Paddington to Cheltenham Spa on 29th August 2026. See today's trains from London Paddington around 1828 →

29th August 2026 Detailed View

18:28 – London Paddington → Cheltenham Spa Arrived +2 Late operated by Great Western Railway

electric for 57 min · diesel from Swindon for 1h06

Reported as far as Cheltenham Spa · 8 of 8 stops made · 121 of 121 miles

Formation Class 802 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
PAD London Paddington 1 1828 1827 -1
RDG Reading picks up passengers only 9 1851 1853 1851 1852 -1
SWI Swindon picks up passengers only Pathed as Class 802 on diesel at 125mph from here 3 1919 1925 1921 1924 -1
KEM Kemble 2 1936 1938 1936 1937 -1
STD Stroud 2 1952 1954 1950 1953 -1
SHU Stonehouse 2 1958 1959 1957 1958 -1
GCR Gloucester 2 2016 2022 2018 2022 ·on time
CNM Cheltenham Spa 2 2031 2033 +2

Italic estimated timing, bold is actual.