This is the 1K03 0600 Bedwyn to London Paddington on 16th September 2026. See today's trains from Bedwyn around 0600 →
16th September 2026 Detailed View
06:00 – Bedwyn → London Paddington Arrived +1 Late operated by Great Western Railway
diesel for 18 min · electric from Newbury for 51 min
Reported as far as London Paddington · 10 of 10 stops made · 67 of 67 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| BDW Bedwyn | 2 | 0600 | 0559 | -1 | ||
| HGD Hungerford | 1 | 0606 | 0606 | 0605 | 0606 | -1 |
| KIT Kintbury | 2 | 0611 | 0611 | 0610 | 0611 | ·on time |
| NBY Newbury Pathed as Class 802 on electric at 125mph from here | 2 | 0617 | 0618 | 0617 | 0618 | ·on time |
| THA Thatcham | 2 | 0622 | 0623 | 0622 | 0623 | ·on time |
| THE Theale | 1 | 0630 | 0631 | 0630 | 0631 | ·on time |
| RDW Reading West | 2 | 0637 | 0638 | 0636 | 0637 | -1 |
| RDG Reading | 10 was 11 | 0641 | 0643 | 0640 | 0643 | ·on time |
| TWY Twyford | 2 | 0648 | 0648 | 0648 | 0650 | +1 |
| PAD London Paddington | 4 | 0709 | 0710 | +1 |
Italic estimated timing, bold is actual.