25th September 2026 Follow Detailed View
20:42 – Bedwyn → London Paddington Arrived +7 Late operated by Great Western Railway
diesel for 19 min · electric from Newbury for 51 min
Reported as far as London Paddington · 8 of 8 stops made · 66 of 66 miles
Formation Class 802 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| BDW Bedwyn | 2 | 2042 | 2053 | +11 | ||
| HGD Hungerford | 1 | 2048 | 2048 | 2059 | 2059 | +12 |
| KIT Kintbury | 2 | 2052 | 2052 | 2103 | 2104 | +11 |
| NBY Newbury Pathed as Class 802 on electric at 125mph from here | 2 | 2059 | 2101 | 2110 | 2111 | +10 |
| THA Thatcham | 2 | 2105 | 2105 | 2116 | 2116 | +11 |
| THE Theale | 1 | 2112 | 2113 | 2124 | 2124 | +12 |
| RDG Reading | 11 | 2121 | 2123 | 2132 | 2134 | +11 |
| PAD London Paddington | 12 was 2 | 2152 | 2159 | +7 |
Italic estimated timing, bold is actual.