This is the 1L74 1203 Cheltenham Spa to London Paddington on 25th August 2026. See today's trains from Cheltenham Spa around 1203 →
25th August 2026 Detailed View
12:03 – Cheltenham Spa → London Paddington Arrived -1 Early operated by Great Western Railway
diesel for 1h01 · electric from Swindon for 55 min
Reported as far as London Paddington · 9 of 9 stops made · 120 of 120 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Cheltenham Spa → Gloucester
1 of 2
Gloucester → London Paddington
2 of 2
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| CNM Cheltenham Spa | 1 | 1203 | 1202 | -1 | ||
| GCR Gloucester | 2 | 1212 | 1219 | 1211 | 1219 | ·on time |
| SHU Stonehouse | 1 | 1229 | 1230 | 1229 | 1231 | +1 |
| STD Stroud | 1 | 1233 | 1235 | 1234 | 1236 | +1 |
| KEM Kemble | 1 | 1249 | 1249 | 1248 | 1249 | -1 |
| SWI Swindon Pathed as Class 802 on electric at 125mph from here | 1 | 1302 | 1304 | 1301 | 1303 | -1 |
| DID Didcot Parkway | 2 | 1319 | 1320 | 1321 | 1322 | +1 |
| RDG Reading | 11 | 1333 | 1335 | 1333 | 1335 | ·on time |
| PAD London Paddington | 9 was 1 | 1359 | 1358 | -1 |
Italic estimated timing, bold is actual.