This is the 1L76 1303 Cheltenham Spa to London Paddington on 1st September 2026. See today's trains from Cheltenham Spa around 1303 →
1st September 2026 Detailed View
13:03 – Cheltenham Spa → London Paddington Arrived +12 Late operated by Great Western Railway
This service has been delayed by a fault with the signalling system.
diesel for 1h02 · electric from Swindon for 54 min
Reported as far as London Paddington · 9 of 9 stops made · 120 of 120 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| CNM Cheltenham Spa | 1 | 1303 | no report | |||
| GCR Gloucester | 1 | 1313 | 1319 | 1323 | +4 | |
| SHU Stonehouse | 1 | 1330 | 1331 | 1335 | 1337 | +6 |
| STD Stroud | 1 | 1335 | 1335 | 1341 | 1345 | +10 |
| KEM Kemble | 1 | 1350 | 1350 | 1400 | 1401 | +11 |
| SWI Swindon Pathed as Class 802 on electric at 125mph from here | 1 | 1403 | 1405 | 1415 | 1417 | +12 |
| DID Didcot Parkway | 2 | 1420 | 1421 | 1433 | 1434 | +13 |
| RDG Reading | 11 | 1433 | 1436 | 1446 | 1448 | +12 |
| PAD London Paddington | 2 was 3 | 1459 | 1511 | +12 |
Italic estimated timing, bold is actual.