26th September 2026 Follow Detailed View
13:03 – Cheltenham Spa → London Paddington Planned operated by Great Western Railway
diesel for 1h01 · electric from Swindon for 55 min
Not yet reported
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Cheltenham Spa → Gloucester
1 of 2
Gloucester → London Paddington
2 of 2
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| CNM Cheltenham Spa | 1 | 1303 | ||||
| GCR Gloucester | 1 | 1313 | 1319 | |||
| SHU Stonehouse | 1 | 1330 | 1330 | |||
| STD Stroud | 1 | 1334 | 1335 | |||
| KEM Kemble | 1 | 1349 | 1350 | |||
| SWI Swindon Pathed as Class 802 on electric at 125mph from here | 1 | 1403 | 1404 | |||
| DID Didcot Parkway | 2 | 1420 | 1421 | |||
| RDG Reading | 10 | 1434 | 1435 | |||
| PAD London Paddington | 3 | 1459 |
Italic estimated timing, bold is actual.