This is the 1L80 1503 Cheltenham Spa to London Paddington on 16th September 2026. See today's trains from Cheltenham Spa around 1503 →
16th September 2026 Detailed View
15:03 – Cheltenham Spa → London Paddington Arrived +9 Late operated by Great Western Railway
This service has been delayed by a problem currently under investigation.
diesel for 1h01 · electric from Swindon for 56 min
Reported as far as London Paddington · 9 of 9 stops made · 120 of 120 miles
Formation Class 802 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Cheltenham Spa → Gloucester
1 of 2
Gloucester → London Paddington
2 of 2
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| CNM Cheltenham Spa | 1 | 1503 | 1503 | ·on time | ||
| GCR Gloucester | 1 | 1512 | 1519 | 1512 | 1518 | -1 |
| SHU Stonehouse | 1 | 1529 | 1530 | 1533 | 1534 | +4 |
| STD Stroud | 1 | 1534 | 1534 | 1538 | 1540 | +5 |
| KEM Kemble | 1 | 1549 | 1549 | 1553 | 1555 | +5 |
| SWI Swindon Pathed as Class 802 on electric at 125mph from here | 1 | 1602 | 1604 | 1607 | 1609 | +5 |
| DID Didcot Parkway | 2 | 1619 | 1620 | 1629 | 1631 | +10 |
| RDG Reading | 11 | 1633 | 1635 | 1643 | 1645 | +10 |
| PAD London Paddington | 11 | 1700 | 1709 | +9 |
Italic estimated timing, bold is actual.