This is the 1L82 1603 Cheltenham Spa to London Paddington on 25th August 2026. See today's trains from Cheltenham Spa around 1603 →
25th August 2026 Detailed View
16:03 – Cheltenham Spa → London Paddington Arrived +6 Late operated by Great Western Railway
diesel for 1h01 · electric from Swindon for 55 min
Reported as far as London Paddington · 9 of 9 stops made · 120 of 120 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Cheltenham Spa → Gloucester
1 of 2
Gloucester → London Paddington
2 of 2
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| CNM Cheltenham Spa | 1 | 1603 | 1605 | +2 | ||
| GCR Gloucester | 1 | 1613 | 1619 | 1613 | 1618 | -1 |
| SHU Stonehouse | 1 | 1630 | 1630 | 1629 | ·on time | |
| STD Stroud | 1 | 1634 | 1634 | 1636 | +1 | |
| KEM Kemble | 1 | 1649 | 1649 | 1649 | 1650 | ·on time |
| SWI Swindon Pathed as Class 802 on electric at 125mph from here | 1 | 1703 | 1704 | 1708 | 1710 | +6 |
| DID Didcot Parkway | 2 | 1720 | 1721 | 1726 | 1728 | +7 |
| RDG Reading | 11 | 1733 | 1735 | 1739 | 1740 | +5 |
| PAD London Paddington | 2 | 1759 | 1805 | +6 |
Italic estimated timing, bold is actual.