1L86 1803 Cheltenham Spa to London Paddington

TrainTimesLive
Menu Close menu

This is the 1L86 1803 Cheltenham Spa to London Paddington on 21st September 2026. See today's trains from Cheltenham Spa around 1803 →

21st September 2026 Simple View

1L86 · 18:03 – Cheltenham Spa → London Paddington Arrived +1 Late operated by Great Western Railway

This service has been delayed by a late running train being in front of this one.

WTTThe permanent working timetable Pathed as Class 802 on diesel at 125mph

diesel for 1h01 · electric from Swindon for 55 min

Reported as far as London Paddington · 9 of 9 stops made · 120 of 120 miles

Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Calling pattern, including passing points
Formed from 5L86 from Cheltenham Spa arrived 18:00 empty stock 800001
Public Working Actual Route
Location PlatformPlat arrdep arrdep arrdep Status Line Path
CNM Cheltenham Spa 1 1803 1803 1802 -1
Barnwood Junction pass 1½ min pathing allowance MLLine pass1809 pass1809 ·on time ML
Horton Road Junction pass pass1812 pass1810 -2
GCR Gloucester reverses here 1 was 2 18131819 18131819½ 18111822 +3
Horton Road Junction pass pass1820½ pass1823 +3
Gloucester Yard Junction pass pass1821½ pass1824 +3
Standish Junction pass pass1827 pass1830 +3
SHU Stonehouse 1 18301830 1829½1830½ 18331834 +4
STD Stroud 1 18341834 18341835 18371839 +4
St Mary's Level Crossing pass pass1839½ pass1843 +4
KEM Kemble 1 min engineering allowance 1 18491850 18491850 18521853 +3
Rodbourne Junction pass pass1900½ passno report
SWI Swindon Pathed as Class 802 on electric at 125mph from here 1 19031904 1902½1904½ 19041905 +1
Uffington (Oxfordshire) pass pass1911 pass1912 +1
Challow pass pass1912½ pass1913 +1
Wantage Road pass 1 min engineering allowance pass1914 pass1915 +2
DID Didcot Parkway MLLine 2 19201921 1919½1921 19201921 ·on time ML
GOR Goring & Streatley pass 1 min engineering allowance MLLine 2 pass1926½ pass1926 +1 ML
Reading High Level Junction pass MLLine pass1932 pass1931 -1 ML
RDG Reading UMLLine 11 19331935 1933½1935½ 19331934 -1 UML
Kennet Bridge Junction pass MLLine pass1936½ pass1936 ·on time ML
TWY Twyford pass MLLine 2 pass1939½ pass1938 +1 ML
MAI Maidenhead pass MLLine 2 pass1943 pass1941 -1 ML
SLO Slough pass MLLine 3 pass1946 pass1944 ·on time ML
Stockley Junction pass MLLineMLPath pass1949 pass1948 -1 ML ML
Heathrow Airport Junction pass MLLine pass1949½ pass1948 -1 ML
STL Southall pass MLLine 2 pass1950½ pass1949 ·on time ML
Acton West pass 1 min engineering allowance MLLineMLPath pass1952 pass1951 ·on time ML ML
Ladbroke Grove pass 3LineMLPath pass1955½ passno report 3 ML
Portobello Junction (London) pass 1 min pathing allowance 3Line pass1956 pass1955 -1 3
Royal Oak Junction pass 2Line pass1958 pass1958 ·on time 2
PAD London Paddington 2 1959 1959 2000 +1
Forms 1G31 to Cheltenham Spa departs 20:34 800001

Italic estimated timing, bold is actual.