This is the 1P28 1318 Hereford to London Paddington on 23rd September 2026. See today's trains from Hereford around 1318 →
23rd September 2026 Detailed View
13:18 – Hereford → London Paddington Partially cancelled — Uninvestigated Cancellations System Roll-Ups only operated by Great Western Railway
This service was cancelled between Oxford and London Paddington.
diesel for 2h28 · electric from Didcot Parkway for 39 min
Reported as far as Oxford · 16 of 19 stops made, 3 cancelled · 87 of 151 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Hereford → Worcester Shrub Hill
1 of 2
Worcester Shrub Hill → Oxford
2 of 2
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| HFD Hereford | 3 | 1318 | 1318 | ·on time | ||
| LED Ledbury | 1334 | 1335 | 1333 | 1335 | ·on time | |
| CWL Colwall | 1341 | 1342 | 1341 | 1342 | ·on time | |
| GMV Great Malvern | 1346 | 1355 | 1346 | 1355 | ·on time | |
| MVL Malvern Link | 1357 | 1358 | 1357 | 1358 | ·on time | |
| WOF Worcester Foregate Street | 1 | 1408 | 1409 | 1407 | 1410 | +1 |
| WOS Worcester Shrub Hill | 2 | 1412 | 1417 | 1411 | 1419 | +2 |
| WPH Worcestershire Parkway (High Level) | 1422 | 1423 | no report | no report | ||
| PSH Pershore | 1428 | 1429 | 1429 | 1430 | +1 | |
| EVE Evesham | 1435 | 1436 | 1436 | 1437 | +1 | |
| HYB Honeybourne | 2 | 1442 | 1443 | 1442 | 1443 | ·on time |
| MIM Moreton-in-Marsh | 2 | 1453 | 1454 | 1454 | 1458 | +4 |
| KGM Kingham | 1501 | 1502 | no report | no report | ||
| CBY Charlbury | 2 | 1511 | 1512 | 1514 | +2 | |
| HND Hanborough | 1518 | 1519 | no report | no report | ||
| OXF Oxford | 3 | 1529 | 1531 | 1529 | ·on time | |
| DID Didcot Parkway Pathed as Class 802 on electric at 125mph from here | 5 | 1543 | 1546 | Cancelled | ||
| RDG Reading | 10 | 1558 | 1601 | Cancelled | ||
| PAD London Paddington | 10 | 1625 | Cancelled |
Italic estimated timing, bold is actual.