This is the 1P40 1902 Great Malvern to London Paddington on 27th August 2026. See today's trains from Great Malvern around 1902 →
27th August 2026 Detailed View
19:02 – Great Malvern → London Paddington Arrived On time operated by Great Western Railway
This service has been delayed by a late running train being in front of this one.
diesel for 1h47 · electric from Didcot Parkway for 39 min
Reported as far as London Paddington · 15 of 15 stops made · 130 of 130 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| GMV Great Malvern | 1902 | 1902 | ·on time | |||
| MVL Malvern Link | 1905 | 1906 | 1904 | 1905 | -1 | |
| WOF Worcester Foregate Street | 1 | 1916 | 1918 | 1921 | 1923 | +5 |
| WOS Worcester Shrub Hill Pathed as Class 802 on diesel at 125mph from here | 2 | 1921 | 1926 | 1924 | 1926 | ·on time |
| WPH Worcestershire Parkway (High Level) | 1931 | 1932 | 1930 | 1931 | -1 | |
| PSH Pershore | 1937 | 1938 | 1936 | 1937 | -1 | |
| EVE Evesham | 1944 | 1945 | 1943 | 1945 | ·on time | |
| MIM Moreton-in-Marsh | 2 | 1959 | 2000 | 1959 | 2000 | ·on time |
| KGM Kingham | 2007 | 2008 | 2007 | 2008 | ·on time | |
| CBY Charlbury | 2 | 2017 | 2018 | 2016 | 2017 | -1 |
| HND Hanborough | 2024 | 2025 | 2023 | 2024 | -1 | |
| OXF Oxford | 3 | 2034 | 2036 | 2033 | 2036 | ·on time |
| DID Didcot Parkway Pathed as Class 802 on electric at 125mph from here | 5 | 2048 | 2049 | 2046 | 2049 | ·on time |
| RDG Reading | 10 | 2101 | 2104 | 2100 | 2103 | -1 |
| PAD London Paddington | 5 was 10 | 2128 | 2128 | ·on time |
Italic estimated timing, bold is actual.