1P40 1902 Great Malvern to London Paddington

TrainTimesLive
Menu Close menu

This is the 1P40 1902 Great Malvern to London Paddington on 24th September 2026. See today's trains from Great Malvern around 1902 →

24th September 2026 Detailed View

19:02 – Great Malvern → London Paddington Arrived +7 Late operated by Great Western Railway

This service has been delayed by train crew being delayed.

diesel for 1h47 · electric from Didcot Parkway for 39 min

Reported as far as London Paddington · 15 of 15 stops made · 130 of 130 miles

Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
GMV Great Malvern 1902 1903 +1
MVL Malvern Link 1905 1906 1904 1906 ·on time
WOF Worcester Foregate Street 1 1916 1918 1919 1920 +2
WOS Worcester Shrub Hill Pathed as Class 802 on diesel at 125mph from here 2 1921 1926 1924 1927 +1
WPH Worcestershire Parkway (High Level) 1931 1932 1937 1939 +7
PSH Pershore 1937 1938 1943 1944 +6
EVE Evesham 1944 1945 1950 1952 +7
MIM Moreton-in-Marsh 2 1959 2000 2008 2009 +9
KGM Kingham 2007 2008 2015 2016 +8
CBY Charlbury 2 2017 2018 2023 2024 +6
HND Hanborough 2024 2025 2030 2032 +7
OXF Oxford 3 2034 2036 2040 2045 +9
DID Didcot Parkway Pathed as Class 802 on electric at 125mph from here 5 2048 2049 2055 2057 +8
RDG Reading 10 2101 2104 2109 2111 +7
PAD London Paddington 2 was 10 2128 2135 +7

Italic estimated timing, bold is actual.