This is the 1L20 1127 Carmarthen and London Paddington to London Paddington on 28th August 2026. See today's trains from Carmarthen around 1127 →
28th August 2026 Detailed View
11:27 – Carmarthen and London Paddington → London Paddington Arrived +2 Late operated by Great Western Railway
This service has been delayed by failure of the electricity supply.
diesel for 1h51 · electric from Cardiff Central for 1h54
Reported as far as London Paddington · 13 of 13 stops made · 221 of 221 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Carmarthen → Swansea
1 of 2
Swansea → London Paddington
2 of 2
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| CMN Carmarthen | 2 | 1127 | 1130 | +3 | ||
| PBY Pembrey & Burry Port | 1 | 1147 | 1148 | 1149 | 1150 | +2 |
| LLE Llanelli | 2 was UPL | 1154 | 1155 | 1156 | 1201 | +6 |
| SWA Swansea Service joins 1B07 from London Paddington 800025 Pathed as Class 802 on diesel at 125mph from here | 1 was 3 | 1213 | 1222 | 1220 | 1225 | +3 |
| NTH Neath | 2 | 1233 | 1234 | 1236 | 1238 | +4 |
| PTA Port Talbot Parkway | 2 | 1240 | 1241 | 1244 | 1245 | +4 |
| BGN Bridgend | 2 | 1253 | 1254 | 1256 | 1258 | +4 |
| CDF Cardiff Central Pathed as Class 802 on electric at 125mph from here | 2 | 1314 | 1318 | 1317 | 1320 | +2 |
| NWP Newport (South Wales) | 3 | 1329 | 1331 | 1331 | 1333 | +2 |
| BPW Bristol Parkway | 4 | 1352 | 1355 | 1357 | 1359 | +3 |
| SWI Swindon | 1 | 1419 | 1420 | 1423 | 1424 | +4 |
| RDG Reading | 10 | 1445 | 1448 | 1449 | 1451 | +3 |
| PAD London Paddington | 8 | 1512 | 1514 | +2 |
Italic estimated timing, bold is actual.