27th September 2026 Follow Detailed View
15:49 – Swansea → London Paddington Planned operated by Great Western Railway
diesel for 1h31 · electric from Cardiff Central for 1h54
Not yet reported
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| SWA Swansea | 3 | 1549 | ||||
| NTH Neath | 1559 | 1600 | ||||
| PTA Port Talbot Parkway | 2 | 1607 | 1608 | |||
| BGN Bridgend | 1 | 1620 | 1622 | |||
| CDF Cardiff Central Pathed as Class 802 on electric at 125mph from here | 1 | 1709 | 1720 | |||
| NWP Newport (South Wales) | 3 | 1731 | 1733 | |||
| BPW Bristol Parkway | 3 | 1753 | 1755 | |||
| SWI Swindon | 3 | 1817 | 1819 | |||
| RDG Reading | 10 | 1844 | 1848 | |||
| PAD London Paddington | 8 | 1914 |
Italic estimated timing, bold is actual.