2L59 1727 Dundee to Aberdeen

TrainTimesLive
Menu Close menu

This is the 2L59 1727 Dundee to Aberdeen on 27th August 2026. See today's trains from Dundee around 1727 →

27th August 2026 Simple View

2L59 · 17:27 – Dundee → Aberdeen Arrived -1 Early operated by ScotRail

WTTThe permanent working timetable Pathed as Class 158/168/170/175 on diesel at 90mph

Reported as far as Aberdeen · 10 of 10 stops made · 70 of 70 miles

Formation Class 158 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spaces

Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Calling pattern, including passing points
Formed from 2L60 from Arbroath arrived 16:59 158719
Public Working Actual Route
Location PlatformPlat arrdep arrdep arrdep Status Line Path
DEE Dundee 1 1727 1727 1727 ·on time
Camperdown Junction pass pass1729½ passno report
BYF Broughty Ferry 2 17331733 17331733½ 1734 +1
MON Monifieth 2 17371738 17371738 no reportno report
CAN Carnoustie 2 17431744 17431744 17441745 +1
ARB Arbroath 2 17501752 17501752 17511753 +1
Inverkeilor pass pass1758½ pass1758 ·on time
Usan not advertised passes another train on the single line, waits for another train to pass 18041804½ 1804 ·on time
MTS Montrose 1 min engineering allowance 2 18081808 1807½1808 18071808 ·on time
Craigo pass pass1814 pass1813 -1
LAU Laurencekirk 18191819 18191819½ 18171819 ·on time
Carmont pass pass1827 pass1827 ·on time
STN Stonehaven 2 18331833 1832½1833 18321833 ·on time
Newtonhill SIG A223 pass pass1839 passno report
PLN Portlethen 2 18421842 1841½1842 no reportno report
Aberdeen A229 Signal pass pass1844 passno report
Aberdeen A55 Signal pass pass1847½ passno report
Craiginches South pass 1 min engineering allowance pass1848½ passno report
Aberdeen Ferryhill Junction pass pass1851 passno report
ABD Aberdeen 6N 1853 1853 1852 -1
Forms 2B35 to Inverurie departs 18:57 158719

Italic estimated timing, bold is actual.