2Y04 1938 Edinburgh to North Berwick

TrainTimesLive
Menu Close menu

This is the 2Y04 1938 Edinburgh to North Berwick on 21st August 2026. See today's trains from Edinburgh around 1938 →

21st August 2026 Simple View

2Y04 · 19:38 – Edinburgh → North Berwick Arrived -1 Early operated by ScotRail

WTTThe permanent working timetable Pathed as Class 385 on electric at 100mph

Reported as far as North Berwick · 7 of 7 stops made · 22 of 22 miles

Formation Class 385 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spaces

Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Calling pattern, including passing points
Formed from 2P06 from Dunblane arrived 19:18 385114
Public Working Actual Route
Location PlatformPlat arrdep arrdep arrdep Status Line Path
EDB Edinburgh 10 1938 1938 1938 ·on time
Abbeyhill Junction pass pass1939½ pass1940 +1
Craigentinny Junction pass pass1940½ pass1942 +2
Portobello Junction (Lothian) pass pass1942 pass1943 +1
MUB Musselburgh 1 19441945 19441945 19451946 +1
Monktonhall Junction pass pass1946 pass1947 +1
WAF Wallyford 1 19481949 19481949 19491950 +1
PST Prestonpans 1 19521952 1951½1952½ 19521953 +1
LND Longniddry 1 19571957 1956½1957 19571958 +1
DRM Drem 1 20042004 2003½2004½ 20032004 ·on time
NBW North Berwick 1 2013 2013 2012 -1
Forms 2Y05 to Edinburgh departs 20:18 385114

Italic estimated timing, bold is actual.