1P86 1958 Great Malvern to London Paddington

TrainTimesLive
Menu Close menu

27th September 2026 Detailed View

19:58 – Great Malvern → London Paddington Planned operated by Great Western Railway

diesel for 1h44 · electric from Didcot Parkway for 48 min

Not yet reported

Formation Class 802 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
GMV Great Malvern 1958
MVL Malvern Link 2001 2001
WOF Worcester Foregate Street 1 2010 2011
WOS Worcester Shrub Hill Pathed as Class 802 on diesel at 125mph from here 2 2014 2015
WPH Worcestershire Parkway (High Level) 2021 2022
PSH Pershore 2027 2028
EVE Evesham 2034 2035
HYB Honeybourne 2 2041 2042
MIM Moreton-in-Marsh 2 2053 2054
KGM Kingham 2101 2102
CBY Charlbury 2 2110 2111
HND Hanborough 2118 2118
OXF Oxford 3 2126 2128
DID Didcot Parkway Pathed as Class 802 on electric at 125mph from here 5 2142 2142
RDG Reading 11 2155 2205
PAD London Paddington 4 2230

Italic estimated timing, bold is actual.