This is the 2D79 2051 Bristol Temple Meads to Bristol Parkway on 25th August 2026. See today's trains from Bristol Temple Meads around 2051 →
25th August 2026 Detailed View
20:51 – Bristol Temple Meads → Bristol Parkway Arrived -1 Early operated by Great Western Railway
Reported as far as Bristol Parkway · 3 of 3 stops made · 6 of 6 miles
Formation Class 158 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spaces
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| BRI Bristol Temple Meads | 1 | 2051 | 2050 | -1 | ||
| FIT Filton Abbey Wood | 2 | 2058 | 2103 | 2057 | 2103 | ·on time |
| BPW Bristol Parkway | 4 | 2107 | 2106 | -1 |
Italic estimated timing, bold is actual.