2R16 0940 Bridgend to Rhymney

TrainTimesLive
Menu Close menu

This is the 2R16 0940 Bridgend to Rhymney on 24th August 2026. See today's trains from Bridgend around 0940 →

24th August 2026 Simple View

2R16 · 09:40 – Bridgend → Rhymney Arrived -1 Early operated by Transport for Wales

VAROverlay: a short-term plan replacing the timetable for this date Pathed as Class 150/153/155/156 on diesel at 75mph

Reported as far as Rhymney · 26 of 26 stops made

Formation Class 150

Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Calling pattern, including passing points
Formed from 2E12 from Rhymney arrived 09:35 150260
Public Working Actual Route
Location PlatformPlat arrdep arrdep arrdep Status Line Path
BGN Bridgend B was 1A 0940 0940 0939 -1
Cowbridge Road pass pass0941½ pass0941 ·on time
Aberthaw SIG Cf3440 pass ½ min pathing allowance pass0948½ pass0949 +1
LWM Llantwit Major 2 09540954 0953½0954½ 09530954 ·on time
Aberthaw pass pass1001 pass1001 ·on time
RIA Rhoose Cardiff International Airport 1 min engineering allowance 1 10041005 10041005 10031004 -1
BRY Barry 1 10131013 10121013 10091012 -1
BYD Barry Docks 1 10161016 1015½1016½ 10151016 ·on time
CAD Cadoxton 1 10191019 1018½1019½ 10181019 ·on time
DNS Dinas Powys 1 10231024 10231024 10231023 -1
EBK Eastbrook 1 10261026 1025½1026½ 10251026 ·on time
CGN Cogan 1 min performance allowance 1 10291029 1028½1029½ 10291030 +1
Cogan Junction pass pass1031½ pass1030 -1
GTN Grangetown 1 10341035 10341035 10331034 -1
Penarth Curve South Junction pass 1 min engineering allowance pass1036 pass1035 -1
CDF Cardiff Central 6 10411041 1039½1041½ 10381040 -1
Cvl East Boundary pass pass1042 pass1042 ·on time
CDQ Cardiff Queen Street 5 10451045 10441045½ 10431044 -1
Heath Junction pass pass1048½ pass1048 ·on time
HHL Heath High Level 10501050 1049½1050 10491050 ·on time
LLS Llanishen 1 10531053 1052½1053½ 10521053 ·on time
LVT Lisvane & Thornhill 1 10561056 1055½1056 10541056 ·on time
CPH Caerphilly 3 11011101 1100½1101½ 11001101 ·on time
ABE Aber 11031104 11031104 11021104 ·on time
LNB Llanbradach 2 11081108 1107½1108 11071108 ·on time
YSM Ystrad Mynach 2 11131113 1112½1113½ 11121113 ·on time
HNG Hengoed 2 11161116 1115½1116 11151116 ·on time
PGM Pengam 1 min engineering allowance 2 11191120 11191120 11191120 ·on time
BGD Bargoed 2 11251125 1124½1125½ 11231124 -1
BHD Brithdir 1 11291129 1128½1129 11281129 ·on time
TIR Tir-Phil 1 11321132 1131½1132½ 11311132 ·on time
PLT Pontlottyn 1 11371137 1136½1137½ 11351137 ·on time
RHY Rhymney 1 1141 1140 1139 -1
Forms 2E28 to Bridgend departs 11:44 150260

Italic estimated timing, bold is actual.