25th September 2026 Follow
19:25 – Cardiff Central → Barry Tourist Railway En route -2 Early operated by Transport for Wales
Empty coaching stock not available to passengers
Reported as far as Cadoxton · 1 of 1 stop made · 6 of 9 miles
Formation Class 756
Cardiff Central → Barry Down Siding
1 of 2
Barry Down Siding → Barry Tourist Railway
2 of 2
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| CDF Cardiff Central not advertised | 8 | 1925 | 1923 | -2 | ||
| Penarth Curve South Junction pass | 19281928 | passno report | ||||
| Cogan Junction pass | 19311931 | pass1929 | -2 | |||
| CAD Cadoxton pass 1 min engineering allowance | 2 | 19371937 | pass1935 | -2 | ||
| Barry Down Siding not advertised operational stop, reverses here UnLine | 19451950 | 19421943 | Un | |||
| Barry Tourist Railway not advertised | 2005 | 1958 | ||||
Italic estimated timing, bold is actual.