450001 on 26th September 2026

TrainTimesLive
Menu Close menu

450001 South Western Railway · 26th September 2026

10 workings 1 diagram 4 vehicles Vehicles average 21 years old 209 open defects across 4 vehicles South Western Railway (2022 Style Livery)

Diagram WM702

From Origin To Destination Headcode Status
0507 Clapham Yard Sidings 0522 London Waterloo via Clapham Yard 5S07 empty stock Arrived
0552 London Waterloo 0708 Weybridge 2S07 En route
0733 Weybridge 0855 London Waterloo 2S16 Planned
0918 London Waterloo 1043 Reading 2C21 Planned
1105 Reading 1237 London Waterloo 2C32 Planned
1252 London Waterloo 1409 Weybridge 2S35 Planned
1433 Weybridge 1558 London Waterloo 2S44 Planned
1618 London Waterloo 1743 Reading 2C49 Planned
1805 Reading 1937 London Waterloo 2C60 Planned
1944 London Waterloo 2030 Wimbledon Park Depot Sdgs via Wimbledon Park C.S.D. 5Y81 empty stock Planned

Formation

450001

Vehicles in order

PosVehicle Age Seats TonnesLivery
4 63201 21 8 48 SW
1 63601 21 8 49 SW
3 64201 21 74 35 SW
2 68101 21 70 35 SW

Mileage a day at a time, from the operator's running total

18th September 2026 149 miles

21st September 2026 340 miles

22nd September 2026 405 miles

23rd September 2026 248 miles

24th September 2026 358 miles

25th September 2026 43 miles

26th September 2026 306 miles

11,302 miles over 29 days

Register history from the fleet sheet

  • Added to the sheet as In Service 22nd August 2026

Only changes seen since we started watching the sheet. A unit repainted before then shows its current livery and no repaint.