800313 Great Western Railway · 12th September 2026
5 workings 1 diagram 9 vehicles Vehicles average 9 years old Great Western Railway Green
Diagram NP005
| From | Origin | To | Destination | Headcode | Status |
|---|---|---|---|---|---|
| 0600 | Swansea Maliphant IEP Dpt | 0604 | Swansea | 5L08 empty stock | Arrived |
| 0623 | Swansea | 0919 | London Paddington via Cardiff Central, Bristol Parkway | 1L08 | Arrived |
| 1000 | London Paddington | 1509 | Penzance via Exeter St Davids, Plymouth | 1C76 | Arrived |
| 1620 | Penzance | 2155 | London Paddington via Plymouth, Exeter St Davids | 1A96 | Arrived |
| 2205 | London Paddington | 2211 | North Pole IEP Depot | 5A96 empty stock | Arrived |
Formation
Vehicles in order
Mileage a day at a time, from the operator's running total
17th September 2026 851 miles
18th September 2026 1,713 miles
19th September 2026 8 miles
20th September 2026 634 miles
21st September 2026 1,901 miles
23rd September 2026 851 miles
24th September 2026 1,569 miles
24,143 miles over 23 days
4 days not shown: the operator's running total went backwards, which is a counter reset rather than a distance.
Register history from the fleet sheet
- Added to the sheet as In Service 22nd August 2026
Only changes seen since we started watching the sheet. A unit repainted before then shows its current livery and no repaint.