The lifts are out of order between platform 2 and the rest of the station at Brentford station.
Trains running between London Waterloo and Vauxhall may be cancelled, delayed or revised. Latest information can be found in the Disruptions area of the National Rail website. More from National Rail
Brentford BFD
| Time | To | Platform | Actual / Expected | Status | Formation |
|---|---|---|---|---|---|
| 2153 | Weybridge | 2 | 2152 | departed | 10 carriages |
| 2154 | London Waterloo | 1 | 2154 | departed | 4 carriages |
| 2223 | Weybridge | 2 | 2224 | departed | 8 carriages |
| 2224 | London Waterloo | 1 | 2224 | departed | 10 carriages |
| 2253 | Weybridge | 2 | 2254 | departed | 8 carriages |
| 2254 | London Waterloo | 1 | 2254 | departed | 8 carriages |
| 2323 | Weybridge | 2 | 2322 | departed | 10 carriages |
| 2324 | London Waterloo | 1 | 2323 | departed | 10 carriages |
| 2353 | Woking | 2 | 2353 | departed | 10 carriages |
| 2357 | London Waterloo | 1 | arrived | 10 carriages |
Italic estimated timing, bold is actual.
Updated 23:58